|
B.Annalakshmi, C.Antony Jeyasehar and P.Valli, "Comparative Study of Pre Planning and Acutual Planning Process in Construction Industries.", International Journal of Emerging Trends in Science and Technology, Volume 1, Number 2, 2014, pp. 117-120. 2014. | |
|
A.G.Rajasekaren and P.Valli, "Analysis of the Success Factors Influencing in Construction.", International Journal of Engineering & Applied Sciences , Volume 6, Number 3, 2014, pp. 21-36. 2014. | |
|
P.Valli , C.Antony Jeyasehar and R. Dhanaraj, "Tower crane selection for an industrial project:case study.", Int. J. Engineering Management and Economics, Volume 4, Number 1, 2013, pp. 84-97. 2013. | |
|
P.Valli and C.Antony Jeyasehar, "Analytical Hierachy Process Based Equipment Selection Method for Construction Project Using Matlab Tool.", International Journal of Advanced Technology in Civil Engineering, Volume 1, Number 3, 2012, pp. 18-22. 2012. | |
|
P.Valli and C.Antony Jeyasehar, "Genetic Algorithm and Analytical Hierachy Process Based Equipment Selection Method for Construction Project Using Matlab Tool: A Comparative Study.", International Journal of Engineering & Applied Sciences , Volume 4, Number 3, 2012, pp. 1-16. 2012. | |
|
P.Valli and C.Antony Jeyasehar, "Genetic Algorithm Based Equipment Selection Method for Construction Project Using Matlab Tool.", International Journal of Optimization in Civil Engineering, Volume 2, Number 2, 2012, pp. 235-236. 2012. | |